Strip Out & Fit-Out

  /  Music   /  Building A Mezzanine Floor

Building A Mezzanine Floor

Description:
Our team was contracted to design and install a custom steel mezzanine floor within a high-capacity trampoline park, transforming previously unused vertical space into a vibrant social and commercial hub. The mezzanine now serves as a spacious café area with panoramic views of the main trampoline arena, along with multiple private party rooms for birthdays and events.

Description:
Our team was contracted to design and install a custom steel mezzanine floor within a high-capacity trampoline park, transforming previously unused vertical space into a vibrant social and commercial hub. The mezzanine now serves as a spacious café area with panoramic views of the main trampoline arena, along with multiple private party rooms for birthdays and events.

The works involved:

  • Full structural assessment and coordination with the client’s engineer to ensure compliance with load-bearing requirements and safety standards.

  • Supply and installation of a bespoke steel frame mezzanine, tailored to fit within the existing warehouse shell without compromising trampoline floor space below.

  • Integration of M&E services for lighting, ventilation, and future café equipment.

  • Installation of fire-rated access staircases and balustrades, with provisions for future lift access.

  • Coordination with follow-on trades for flooring, glazing, and fit-out of the café and party areas.

The works involved:

  • Full structural assessment and coordination with the client’s engineer to ensure compliance with load-bearing requirements and safety standards.

  • Supply and installation of a bespoke steel frame mezzanine, tailored to fit within the existing warehouse shell without compromising trampoline floor space below.

  • Integration of M&E services for lighting, ventilation, and future café equipment.

  • Installation of fire-rated access staircases and balustrades, with provisions for future lift access.

  • Coordination with follow-on trades for flooring, glazing, and fit-out of the café and party areas.

This project was delivered on time and within budget, allowing the trampoline park to expand its offerings, increase dwell time for parents, and add valuable revenue streams through F&B and private hire.

This project was delivered on time and within budget, allowing the trampoline park to expand its offerings, increase dwell time for parents, and add valuable revenue streams through F&B and private hire.

Comments

  • November 20, 2019
    reply

    Wayne Cooper

    Vivamus elementum semper nisi. Aenean vulputate eleifend tellus. Aenean leo ligula, porttitor eu, antero consequat vitae, eleifend ac, enim. Aliquam lorem ante, dapibus in, viverra quis, feugiat a, tellus.

    • November 20, 2019
      reply

      Doris Mitchell

      Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat eliter massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu.

  • November 20, 2019
    reply

    Aaron Kim

    Etiam rhoncus. Maecenas tempus, tellus eget condimentum rhoncus, sem quam semper libero, sit amet adipiscing sem neque sed ipsum. Aliquam lorem ante, dapibus in, viverra quis, feugiat a, tellus.

Post a Reply to Doris Mitchell cancel reply

d
Follow us